Requirements
The Rigging Foreman provides technical and technological problem-solving abilities for production engineering processes and planning. Responsibilities include leading work teams, controlling production processes for material handling, movement, and coordination of piping systems. Requires specialization in critical lifting and rigging activities, pipe and material movements, and coordination with crane and forklift operators. Must be responsible for all pipe shop and onboard piping logistics, ensuring loads are secure and lifted according to yard safety standards. The role involves applying engineering practices to resolve management challenges, scaling and integrating resources for efficiency, monitoring manpower consumption, and preparing fit-for-purpose work permits and risk assessments.
Description
Reports To Head of Piping Production WorkshopDirect ReportsRigging SupervisorAs a Subject Matter Expert (SME), the Rigging Foreman [Workshop & Project - Rigging & Movement Logistics] provides the technical & technological problem-solving ability of production engineering process and planning abilities in order to lead work teams and control production process for material handling, movement and coordination of piping systems and their components between workshops. Work is executed to a high quality & auditable standard that is consistent with contract work scope, statutory & code requirements, Integrated Management System (IMS) procedures, design parameters, site survey input, Welding Procedure Specification (WPS), stress inputs and vendor data. This job, and subordinates, are performing safe material lifts and movements of piping systems between workshops and projects.Key Accountabilities:1. Specialize for critical lifting and rigging activities including arranging of crane and forklift service.2. Responsible for all pipe shop & onboard piping logistics such as pipe and material movements.3. Leads a rigging group, that ensure loads are secure, lifted according to yard safety standards4. Coordinates with crane operator to ensure work schedules are not interrupted. All crane lifts need to ensure materials are on location before work starts.5. Coordinate for forklift operation to shift pipes.6. Coordinate with Production Engineer (in charge) for sending pipe for coating (blast/paint/galvanize)7. Coordinate with transport section to arrange transport for outside yard operations i.e., galvanizing and afloat service.8. Apply a wide knowledge of engineering practices to resolving management challenges related to production to accomplish the production process in the most effective, efficient and most-economic way.9. Responsible to scale and integrate physical, human and financial resources at meet high efficiency levels at the lowest possible cost & in pursuit of continuous further improvement. Monitor the daily manpower/manhour consumption for the projects and report to manager. Monitor the daily manhour consumption for the projects and update to section manager for any discrepancy. Plan and allocate the manpower as per the vessel work scope. Closely monitor the daily manpower allocation (WHA). Addresses additional manpower requirements to the section manager to allocate10. Review the piping section Work Instructions (WI), Risk Assessment (RA) to cover all the piping activities. Closely follow-up the project in charges for the vessel documentation (SI/Technical Query Report/Work Completion Form/Lesson learnt & Project Postmortem) after completion of vessels.12. Prepare fit for purpose work Permits & Risk Assessments for the identification, control and/or mitigation of workplace risk.13. Review and update the section Risk Assessments/Environmental Aspects & Impacts as per the latest safe practice and get approval from piping manager.